Issue link: http://digital.copcomm.com/i/1124104
E F G devised for both load-in and construction. It was a privilege to be able to collaborate with such a skilled local team and to accomplish so much in the speedy timeframe. Roxanne magically pushed drawings out the door to the shop floor, and Doug expertly turned around construction in days, employing amazing techniques to transfer the Art Department's 3D model components straight into machine-cut pieces that went up with lightning speed. The scope of talent in the construction department was unparalleled. For the design of the Sector 12 Lab, I tapped into my theater background to find a language for the giant skeletal shape that felt immense but would also be practical in terms of construction and timeframe. Glen Schroeder's concept render of the set was in fact so beautiful, it set off concerns that it would be beyond a realistic scope, but employing D

