ADG Perspective

March-April 2022

Issue link: https://digital.copcomm.com/i/1449234

Contents of this Issue

Navigation

Page 88 of 119

We moved on and repainted The Simpsons 35-foot by 102-foot mural using acrylic. This one went fast, only taking three weeks. The image was already in place and we matched the animation color callouts and o we went. Because of the constant truck trac parked at this stage, the mural needs constant touch-up. I usually get called at the Christmas break when all the shows are down. Jim and I also did several murals at the on-lot studio daycare center. I designed each of the four murals to be age appropriate to each of the sections. A lot of animals for the toddlers. Trucks, farm equipment, farm animals and bright colors E. THE FINISHED COMMISSARY MURALS. F. THE FINISHED SIMPSONS MURAL. G. DETAIL OF THE SEVEN YEAR ITCH MURAL. A. PAINTING THE COMMISSARY MURALS. B. THE COMMISSARY MURALS IN PROGRESS. C. THE SEVEN YEAR ITCH MURAL IN PROGRESS. D. THE SEVEN YEAR ITCH MURAL COMPLETED. G E F

Articles in this issue

view archives of ADG Perspective - March-April 2022