Issue link: https://digital.copcomm.com/i/1156976
S E P T E M B E R 2 0 1 9 I 3 DGA Los Angeles Theater Project Update In September, the DGA will pull back the curtain on the upgrades to the Guild's Los Angeles Theater One. The project — which has been going on since March of 2019 — is designed to maximize the on-going efforts to provide our members with the most optimal theatrical viewing experience by upgrading both the audio and projection systems. These upgrades feature the installation of a state-of-the-art Dolby Atmos surround sound system and a Dolby Vision laser projection system, considered the gold standard for screening rooms. The theater will continue to have 35mm and 70mm capabilities as well as a Xenon 4K digital projection system. The work on the projection booth has been completed and new carpeting has been installed in the theater along with a T-Coil assistive listening device. There is also a new projection screen, curtain and masking system. The theater complex's 30-year-old HVAC system has also been replaced and the work on the new lobby restrooms has been completed. During the renovation period, all DGA screenings have taken place fi ve blocks east of Guild Headquaters at the Harmony Gold Preview House. DGA membership screenings will return to our own theater in late September, along with the annual COLCOA French Film Festival. See more on the Los Angeles Theater in the next issue of DGA Monthly. DGA Los Angeles Theater One in various stages of the upgrade project. For September 2019 Los Angeles membership screening venue information, check the listings in the calendar and screenings sections of this issue or online at www.dga.org. See page 17 about the Theater Re-opening Schedule.

