ADG Perspective

May-June 2021

Issue link: http://digital.copcomm.com/i/1381679

Contents of this Issue

Navigation

Page 97 of 131

During the heat of production, Art Director Kevin Hardison bought me time to see the right location and get an idea of how to solve for future problems. He was always working on today and the next day, and I was working on next week. When we got a chance to compare notes, usually at the end of the day, I would download my thoughts to him and he to me. It was morphing and changing all the time. "How can you get lost if you don't know where you are going?" At the same time this is going on, we were checking out paint treatments, construction progress, set dec progress and talking to props. There was usually something that needed to be dealt with. A. B&O TRAIN BRIDGE. IN PROGRESS. SET PHOTO. B. B&O TRAIN BRIDGE WITH STEAM ENGINE. C. RAILROAD STEAM ENGINE. SET PHOTO. D. TRAIN CROSSING LANDSCAPE. PRODUCTION STILL. E. CHARLESTOWN JAILHOUSE. SET PHOTO. F. CHARLESTOWN JAILHOUSE. PLAN AND ELEVATIONS. DRAWN BY GLENN RIVERS. G. PIKESVILLE IN FLAMES. PRODUCTION STILL. A B C D

Articles in this issue

view archives of ADG Perspective - May-June 2021