ADG Perspective

November-December 2016

Issue link: https://digital.copcomm.com/i/747534

Contents of this Issue

Navigation

Page 45 of 131

VERIFY WITH EXISTING EXPOSED EDGE 2'-0" PAINTED METAL EDGE 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 8 1/2" (verify) EQ. EQ. COPE AROUND WEIR WALL 2' 0" 2' 0" 2' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 8 1/2" (verify) EQ. EQ. COPE AROUND WEIR WALL 8' 0" 58' 0" 8' 0" EQ. EQ. EQ. EQ. EQ. 20' 0" PROCESS TANK 20' 0" (PROCESS TANK) 1 1 EQ. EQ. 2' OVERLAP 8'L x 2'D Painted Scallop METAL OVERLAP METAL OVERLAP 1 1 1 1 C Elevation - Bandstand - East Tank Edge Scale: 1/4" = 1'-0" B 3D Model Diagrams FOR REFERENCE ONLY A F.S.D. - BENT METAL TANK EDGE @ PROCESS TANK FULL SIZE DETAIL D Elevation - South Tank Edge Scale: 1/4" = 1'-0" E Elevation - West Tank Edge (Process Tank) Scale: 1/4" = 1'-0" F Elevation - North Tank Edge Scale: 1/4" = 1'-0" G KEY PLAN NTS- REFERENCE ONLY E F C D SHT04 WIER WALL PROCESS TANK STAGE FLR WIER WALL PROCESS TANK STAGE FLR METAL EDGE IS FLUSH TO TOP OF WOOD STAGE FLOOR 10'L x 2'D PAINTED SCALLOP DESIGN (COLORS BELOW) METAL PAINTED TO MATCH STAGE FLOOR METAL PAINTED TO MATCH BLACK TO MATCH TANK WALL INSTALL METAL EDGE ALONG 3 FULL EDGES & PARTIAL ALONG BANDSTAND EDGE BLACK PAINTED METAL EDGE BEYOND WHITE PAINTED METAL SCALLOP EDGE BEYOND TOP OF TANK/ STAGE FLOOR BEYOND PLYWOOD AS REQ. SONY STAGE 30 FLOOR ALIGN BLUE SCALLOP: Ben. Moore #2059-50 "Pool Party" WHITE SCALLOP: Ben. Moore #OC-104 "Antique Lace" STAGE FLOOR: Paint to match existing "Gray" stage floor BLACK METAL EDGE: Paint to match existing tank wall "Flat black" PAINT NOTES GENERAL: - All top edges must be non-skid 2' 0" 4' 0" 2' 0" 8' 0" STRAIGHT METAL EDGE 8' 0" STRAIGHT METAL EDGE 74' 0" BANDSTAND (CURVED EDGE) TANK 1 PROCESS TANK BANDSTAND 3D MODEL REFERENCE NTS- REFERENCE ONLY 3D Model Diagram FOR REFERENCE ONLY 130 STAGE SET ABOVE WATER BR Stage 30 - Sony Pictures, Culver City, CA "JONAH'S DAUGHTER" BENT METAL TANK EDGE Details As Noted 04 12/05/14 RELEASED 12/05/14 REVISED 12/15/14 like I had a head start. There's so much history in all those stages already. It was like dusting off an old car in the garage. At The Lot, the old studio mill became the construction space. It was way too small, but we had the stages, too. It was like turning back time and I treated it like that. I've never worked on a project that had more craftspeople practicing their arts as if it were 1950—carpenters, painters, sculptors, plasterers, drapers, Scenic Artists, greens people, a full staff shop—it was exciting to see history come to life. The Art Department was also on The Lot. Just like the old days, we could all walk from the office to the mill and from stage to stage, before hopping in our cars to check on a local Hollywood location. I imagine it was like being a part of an old Art Department on a studio lot during the golden age, walking from stage to backlot to stage, through a Roman courtyard to a big ornate drawing room to a western bunkhouse, all in one after-lunch walk-through. It was really a lot of fun. Right: A SketchUp ® drawing by Bradley Rubin of details of the pool coping to dress up the sides of the tank with scalloped edges for the Jonah's Daughter sequence on Stage 30 at Sony Studios. Below: Three photographs, the first showing the special effects crew applying black plastic to the bottom of the pool before filling it. The existing tank is concrete and Sony wouldn't allow it to be painted, so this created a dark bottom. (I'm not sure how they did it in the '40s and '50s for Esther Williams.) The second shot of the tank is looking toward the orchestra platform, showing the carved foam set and metal pool coping; pink rocks would later be placed underwater with a treasure chest on top, like an oversized aquarium at home. Last is a frame capture of Scarlett Johansson swimming toward the treasure chest after diving from the top of the stage out of a flying sundae cup.

Articles in this issue

view archives of ADG Perspective - November-December 2016