ADG Perspective

January-February 2016

Issue link: https://digital.copcomm.com/i/619377

Contents of this Issue

Navigation

Page 41 of 115

Above: An early model of the fort drawn by Mr. Fisk in SketchUp ® with snow added in Painter. Right: This drawing by Assistant Art Director Chris Beach reflects early thinking about leaded glass windows. Mr. Fisk: "I ended up deciding in favor of a straight rectangle over the diamond shape because I thought the diamond was too English and quaint." Opposite page, top to bottom: The post- and-beam structure for the fort's office was prefabricated in the shop in Vancouver and trucked to Canmore, Alberta, where it was erected again and construction and paint were completed. The palisades and the other buildings in the fort were built with logs received from the Parks, augmented by a greens department tree-cutting permit. A finished and dressed interior of one of the fort buildings. 40 P E R S P E C T I V E

Articles in this issue

view archives of ADG Perspective - January-February 2016