ADG Perspective

September-October 2018

Issue link: https://digital.copcomm.com/i/1010570

Contents of this Issue

Navigation

Page 95 of 111

was real and what was digital, plus what moved and what had to stay static, all within budget and on schedule. Solving zingers 3 & 4 – As locations weren't panning out, I reached out and was able to bring on an Art Department superhero, Set Designer (and oft-time Art Director) Dan Jennings. While continuing the more and more frustrating hotel scouting, Dan, Jon and I concurrently developed an alternative stage set option. That in hand, we took the team to scout several hotels, and also a floor in the Palace Theatre that could accommodate a partially build a set. Comparing the costs for renting a stage and building a set, versus renting and adapting a location (parking Downtown: it is astounding how expensive parking has gotten Downtown, and security, oy, the security costs…), the producers determined that, while it would cost a bit more to build the set, the savings in efficiency by shooting on a stage should make up for it. Plus, on a soundstage, Drew could get the shots he wanted. However, that plan would work only if we shortened the hallways, built just two of the five needed hotel rooms, and built only the lounge or the bar. We needed all five rooms to tell the story, and Drew wanted both the bar and the lounge for valuable narrative reasons, and those long hallway tracking shots were critical. So the challenge was to figure out how to make one unit set feel like it was much larger and more complicated. This effort lead to the last addition to our small but mighty Art Department, Joe Weber, who came in as a last-minute life-saving Junior Set Designer in a mad dash to help figure out both some of the A. PRODUCTION STILL OF THE LOS ANGELES SUITE. B. LOS ANGELES SUITE MURAL, DONE IN PHOTOSHOP BY ANDREA DOPASO. C. PRODUCTION STILL OF THE NIAGARA SUITE. D. NIAGARA SUITE PHOTOSHOP ARTWORK FOR THE WALL MURAL. E. PRODUCTION STILL OF THE NICE SUITE. F. NICE SUITE PHOTOSHOP ARTWORK FOR THE WALL MURAL. A B C D E F

Articles in this issue

view archives of ADG Perspective - September-October 2018