Production Sound & Video

Summer 2021

Issue link: http://digital.copcomm.com/i/1380878

Contents of this Issue

Navigation

Page 22 of 43

Summer 2021 – LOCAL695.ORG 23 Hands-down the greatest challenge we would face on this film was the water. A main component of the story involved our lead cast entering caves that are surrounded by waterfalls, swimming through flooded tunnels, and a daring escape where they jump off a waterfall and land in a lake. While some of the waterfalls would be real and in practical locations, our main cave set, the one surrounded by waterfalls, would be built in a warehouse just outside of Bangkok. This was one of those moments where you can talk about a set in theory, and plan as much as you want, but until you are standing in front of the actual set, and can hear the roar of the six working artificial waterfalls, you really don't know exactly what you are in for. In prep, the thinking at first was to try and keep the cast as dry as possible, for continuity as well as for ease of shooting. But this set was not going to allow for that. The kids were going to get soaked, and I would have to figure The waterfall set Amanda's sound cart Mixing in the practical cave

Articles in this issue

Links on this page

Archives of this issue

view archives of Production Sound & Video - Summer 2021