Production Sound & Video

Winter 2020

Issue link: http://digital.copcomm.com/i/1197261

Contents of this Issue

Navigation

Page 50 of 55

51 some songs, and some sections of songs that would need to be music playback so the tempo could be rigid for the cho- reography involving up to forty-two dancers and twenty- four singers. It became further complicated because there were multiple instances within a song where the music would need to be live, and then playback, live, and then playback again. We were very fortunate in finding Victor Chaga, our Music Playback Operator whose technical abilities are first class. He fitted straight into the team, which is so impor- tant on a stressful film set, especially this film set, where nothing would operate without music. It was important that everyone on our team had the right temperament to be able to deal with what can often seem like unreasonable requests within the timeframe expected. When we started rehearsing, the tricky part was going from live to playback seamlessly. There were two main pianists, James Taylor and Mark Aspinall. Something we learned from Les Misérables was the importance of whoev- er rehearsed with the actor then transferred to the set. The actor would develop the part with their pianist and then know that same person is on set accompanying them in exactly the same way as it had been rehearsed. Rehearsals were also taking place at the same time as shooting, so there was always a need for at least two pianists. James and Mark were playing in an acoustically treated booth, without windows, so communication was always going to be an issue. Our first thought was would it be better for Victor to go in the booth with the pianist, like a small theatre pit band so they could have good communica- tion with each other. But there were many more reasons why Victor should stay next to Simon, reasons that might be the difference between the smooth running of the set or not. The first attempts going from live to playback, and back to live again felt glitchy, too random in execution and not musical because of the disconnect. We were concerned; this had to feel musically perfect and seamless one hundred percent of the time. This led to many discussions about how these two things could interface better. Memories came back of playing in a band as a teenager and our drummer used to have a foot switch to trigger a MIDI sequencer. There's something about the person play- ing to match the sequencer if they are the ones that trigger it. We discussed this idea with James and Mark about using a non-latching foot switch, which would start and stop the Pro Tools music playback. They agreed to give it a go and we bought a foot switch with USB extender cables. After the first rehearsal, it became clear this was the way forward, it was instantly more seamless. Victor was able to keep play- ing back from the right bar number, making sure it had stopped when it should and re-cueing for the next playback. We now had a system we felt could be taken onto the Cats film set. This was improved further by having a second monitor in the keyboard booth that had the Pro Tools bar count window visible to the pianist, so they could have the confidence knowing that if music playback starts at 'bar 53,' they could see Pro Tools was cued up and ready to go, whilst playing up to it. The interior of the sound- proofed Keyboard booth interior. The Keyboard players had monitors for camera feeds and Pro Tools. The two mics on the stand were necessary as one was routed to the cast direct and the other to the music department comms system.

Articles in this issue

Archives of this issue

view archives of Production Sound & Video - Winter 2020