Issue link: http://digital.copcomm.com/i/1197261
sandbags, in trees, in piles of mud on top of the trenches, on munitions boxes, etc. I got the Drapes Department to make us some bags from the same material as the army sandbags and used these, as well as leaves and artificial grass smeared in mud to disguise equipment (speakers, receivers, antennas, etc.). Hundreds of feet of fibre-optic cable were used, which was new to me. It's great what can be achieved with it, but it's expensive, fragile, and tem- peramental. The cable can fail if the connectors are not absolutely clean (not easy when it's raining and everything is covered in mud!). We would all be relying on wireless links so I had to establish from the start with the Camera, Video, and RF departments that we would all use the lowest power possible for our transmitters. We concentrated any amplification on the receiver end. I managed to see most of the locations four months before filming so I could examine what could be beneficial or det- rimental to the sound before any construction took place. This was an exceptionally collaborative production and I was fortunate enough to have previous experience work- ing with key crew; Production Designer Dennis Gassner, DOP Roger Deakins, Camera Operator Peter Cavaciutti, Location Manager Emma Pill, and the Costume Designers Jacqueline Durran & David Crossman, so that all helped enormously. (Trinity camera rig op was Charlie Rizek, who was new to the team.) In pre-production with the camera team and their rigs, we made some useful improvements to the noise of their gyroscopes and a company called Cobham built us a spe- cial fan-less version of their high-powered miniature video transmitter which really made a difference. I lobbied all departments to prepare to be able to work without electricity so we wouldn't require the noise of a generator on location. In the end, we did need one generator for some equip- ment, but there would not be spare power for nonessen- tials as I wanted it to be as quiet as possible and that meant keeping it small. We found one which looked promising, it was well-silenced and newly built on the back of a Land Rover 4x4. It was in use on another film when we were in prep so I went to that set to have a listen for myself and chat with the sound mixer there. I concluded that it would be workable as long as we kept it at least one hundred yards from the action and we got it reserved for our dates. There was a period of rehearsals and "proof of concept" work with camera, sound, and cast which gave us a good dummy-run at achieving the distances we would face for the shoot. We were able to try things out and develop a way of working to suit Sam's process. Any testing or rehearsal is useful. Even putting lav mics on actors when their cos- tumes are not finalised, you always learn something. I have to thank Sound Mixer Tim White and Boom Op Peter Davis for stepping in on my behalf to this early rehearsal period and solving a lot of the issues. We had the luxury of being able to plan. We knew where the camera would be, where the actors would be and could plan where to install and hide the infrastructure to be able to capture the sound and relay the mix to everyone else involved in the elaborate choreography of the piece. Director Sam Mendes discusses the scene with Script Supervisor Nicoletta Mani and Co-writer Krysty Wiilson-Caims An antenna carefully designed as vegetation. Stuart and 1st Assistant Sound Hugh Sherlock recording a 100-year-old army truck.

